Investment & infrastructurePerspective
Maintenance is an investment decision made before the asset opens
The opening ceremony marks the start of operating obligations. Maintenance planning should already be part of the capital case.

A new asset makes its purpose visible. A road is opened, equipment is installed or a facility begins serving customers. From that point, performance depends partly on work that attracts much less attention: inspections, repairs, replacement and routine care.
Maintenance belongs in the original investment decision because it influences both cost and the durability of the service being financed.
The World Bank’s project-risk guidance treats operating performance and costs as material financing considerations. That is a useful counterweight to presentations dominated by construction.
Establish the responsibility before handover
Who maintains which components, to what standard and with what resources? Contracts and operating plans should answer compatible versions of those questions.
The transition from construction to operation deserves particular attention. Information about equipment, warranties and service requirements needs to reach the team expected to operate the asset.
Read deferred spending as a future obligation
Reducing maintenance can improve a short-term cash balance while increasing the likelihood of disruption later. Investors need enough information to distinguish efficiency from postponement.
The model should include a realistic lifecycle view, supported by technical advice. Contingencies should be connected to identified exposures rather than a number inserted to make the spreadsheet look complete.
For a public-service asset, deteriorating performance can also affect users and the reputation of the parties involved. Those consequences strengthen the case for clear monitoring and accountability.
The most useful financing plan supports the asset through operation, with a credible source of money and capability for its upkeep. Opening day is a milestone in the investment’s life, not the point at which its obligations end.
Sources & context
- World Bank PPP Resource Center: Risk allocation in public-private partnerships ↗
Reviewed 26 October 2026
Reporting sources are linked above. Analysis by Bankole & Associates. Sources reviewed 26 October 2026.
Preparing a financing opportunity?
Speak to Bankole & Associates about your capital requirement.
Submit a mandate →